Anasuria Operating Co. Jumper Spool

Project description: 
In 2017, Anasuria Operating Company decided to install gas lift capability on one of their wells. AOC considered flexible pipe as well as other pipe options and choose TCP and Strohm. With order placement in May 2017, the Jumper Spool was installed on the North Sea October 2017. The Jumper Spool has a design life of 20 years.

Key system characteristics

  • De-risking project schedule
  • Manufactured in advance, terminated prior to installation on site
  • Significantly more tolerance in length than rigid pipe
  • Can be deployed using subsea pallet
  • No metrology required, faster first oil 

Lowest total installed cost

  • Reduced fabrication cost
  • Reduced buoyancy cost
  • Reduced transport costs
  • Reduced installation costs

 

Need more information?

Frits Kronenburg

Business Development Manager